Standard Engineering Design Specifications - Effective 10/10/2023

2023 Standard Specifications for the Construction of Roads and Bridges – Approved by Commissioners Court on October 10, 2023 
 

The 2023 Standard Specifications for the Construction of Roads and Bridges is now available for download.  Eleven (11) new standard specifications have been added and fifty-eight (58) standard specifications have been revised and/or updated in this review cycle. To explore the revised 2023 Standard Specifications, you can either read our comprehensive PDF document or watch our informative video, which covers the additions, revisions, updates and withdrawals made during the 2023 review cycle. Please note that if a dispute should arise over the interpretation of a specification, the County Engineer's determination shall be considered final.

The files are in Adobe .pdf format.  If you do not already have this reader, it is available free for download at Adobe's website.  

To download the 2023 Standard Specifications for the Construction of Roads and Bridges, please click here.

Please note that the archived 2017, 2016, 2015 and 2014 versions of the Standard Specifications are also provided below.
 

Standard Engineering Design Specifications - Effective 9/1/2017

 

Item No. 100's - Specification Section Revision Dated After
102 Clearing and Grubbing 8 5/1/2016
104 Removing Old Concrete 5 6/1/2015
110 Roadway Excavation 9 5/1/2016
120 Excavation for Channels and Other Drainage Facilities 8 6/1/2016
130 Borrow 7 5/1/2016
132 Embankment 8 5/1/2016
160 Topsoil 7 5/1/2016
162 Sodding for Erosion Control and Stabilization 8 5/1/2016
164 Seeding and Erosion Control Blanket 5 6/1/2015
165 Hydro-Mulch Seeding (for Erosion Control and Stabilization) 6 6/1/2015
166 Fertilizer 3 6/1/2015
Item No. 200's - Specification Section Revision Dated After
200 Stripping 7 5/1/2012
205 Subgrade 6 5/1/2016
220 Lime Stabilized Subgrade 1 5/1/2016
221 Hydrated Lime and Lime Slurry 5 5/1/2016
222 Portland Cement Stabilized Subgrade 4 5/1/2016
223 Lime-Fly Ash or Fly Ash Stabilized Subgrade 1ST Issue 6/1/2015
224 Quicklime (Stabilization) 4 6/1/2015
230 Crushed Aggregate Base Course 5 5/1/2016
231 Cement Stabilized Crushed Aggregate Base Course 6 5/1/2016
250 Hot Mix Asphaltic Concrete Base Course (Black Base) 11 9/1/2017
251 Base Repair with Hot Mix Asphaltic Concrete Base Course 6 5/1/2016
252 In-Place Full Depth Cold Flexible Pavement Recycling 4 5/1/2014
Item No. 300's - Specification Section Revision Dated After
309 Milling Existing Pavement 2 5/1/2016
310 Prime Coat/Sealer 7 5/1/2016
320 Single Course Surface Treatment 5 6/1/2015
322 Two Course Surface Treatment 6 6/1/2015
323 Emulsified Asphalt Treatment 3 3/1/2012
324 Seal Coat 4 5/1/2016
340 Hot Mix-Hot Laid Asphaltic Concrete 13 5/1/2016
341 Hot In-Place Asphalt Recycling 4 5/1/2016
360 Concrete Pavement 18 9/1/2017
361 Full Depth Repair of Concrete Pavement 5 5/1/2016
Item No. 400's - Specification Section Revision Dated After
400 Structural Excavation and Backfill 5 5/1/2016
402 Bank Sand Backfill 4 3/1/2012
403 Driving Timber Piling 3 3/1/2012
404 Driving Steel Piling 3 3/1/2012
405 Driving Concrete Piling 3 3/1/2012
407 Treated and Untreated Timber Piling 3 3/1/2012
408 Steel Sheet Piling 2 3/1/2012
409 Steel H Piling 1 11/1/2008
410 Prestressed Concrete Piling 4 9/1/2017
411 Drilled Shaft Foundations 4 3/1/2012
420 Concrete Structures 4 9/1/2017
421 Structural Concrete 10 5/1/2016
423 Prestressed Concrete Units 4 9/1/2017
424 Extending Concrete Structures 2 11/1/2008
427 Joint Sealant for Bridges 1ST Issue 3/1/2012
429 Trench Safety System 1 11/1/2008
430 Construction of Underground Utilities 11 5/1/2014
431 Jacking, Boring or Tunneling Pipe 2 3/1/2012
432 Tunnel Construction 2 3/1/2012
433 Cement Stabilized Sand Bedding and Backfill Material 12 3/1/2012
434 Flowable Fill 2 11/1/2008
435 Timber Ordered Left In Trench 2 11/1/2008
436 Well Pointing 2 3/1/2012
437 Elastomeric Materials 3 5/1/2014
438 Preformed Joint Seal 3 5/1/2016
439 Polyurethane Joint Seal 2 5/1/2014
440 Reinforcing Steel 3 5/1/2014
441 Steel Structures 1 11/1/2008
442 Metals for Structures 3 5/1/2014
445 Structural Bolting 2 11/1/2008
446 Structural Welding 2 5/1/2014
447 Painting and Protective Coating 2 3/1/2012
448 Bridge Plaque 3 5/1/2014
450 Concrete and Steel Railing 4 3/1/2012
451 Removing and Replacing Damaged Railing 2 3/1/2012
452 Removing Railing 1 2/1/2010
453 Temporary Railing 2 5/1/2014
455 Timber for Structures 1 11/1/2008
456 Timber Structures 3 5/1/2014
457 Timber Preservative and Treatment 2 5/1/2014
458 Hardware for Heavy Timber Construction 2 5/1/2014
459 Timber Bents 1 3/1/2012
460 Reinforced Concrete Pipe 10 9/1/2017
461 Corrugated Metal Pipe 7 3/1/2012
462 Clay Pipe 2 3/1/2012
463 Safety End Treatment 6 5/1/2014
464 PVC Pipe 1 11/1/2008
465 Remove and Dispose of Existing Concrete or Metal Pipe 2 5/1/2014
471 Precast Concrete Manholes and Junction Boxes 10 9/1/2017
472 Inlets 10 5/1/2014
473 Adjusting Manholes and Inlets 2 11/1/2008
476 Hydrostatic Testing of Pressure Lines 1 11/1/2008
477 Low Pressure Air Test - Sanitary Sewer Line 3 5/1/2014
480 Precast Reinforced Concrete Box Sewers 1 9/1/2017
481 Monolithic Reinforced Concrete Box Sewers 6 5/1/2014
491 Reinforced Concrete Slope Paving 5 9/1/2017
493 Riprap 2 11/1/2008
494 Geotextiles 2 3/1/2012
495 Removing Old Structures 2 11/1/2008
Item No. 500's - Specification Section Revision Dated After
500 Remove and Relocate or Dispose of Traffic Signs, Mail Boxes and Roadway Signs 3 5/1/2014
501 Tree Protection and Trimming 3 5/1/2014
510 Planing and/or Texturing Pavement 2 5/1/2014
516 Installation of Flex Beam Guardrail 10 5/1/2014
520 Weighing and Measuring Equipment 2 5/1/2014
526 Membrane Curing 5 5/1/2014
530 Concrete Curb, Concrete Curb and Gutter, Sidewalks and Driveways 8 9/1/2017
531 Coloring Concrete for ADA Ramps 2 5/1/2014
535 Medians and Directional Islands 5 5/1/2014
536 Coloring Concrete for Median Noses 2 5/1/2014
537 Wheel Stops 2 5/1/2014
540 Removing and Disposing of Existing Asphaltic Surface and Base Material 2 5/1/2014
550 Existing Fencing and Gates 2 5/1/2014
554 Wood Fencing 2 5/1/2014
555 Chain Link Fencing 5 5/1/2014
556 Four Strand Barbed Wire Fence 4 5/1/2014
559 Construction Safety Fence 1 5/1/2014
560 Maintenance and Cleanup of the Project Site 2 5/1/2014
561 Video Recording Construction 2 11/1/2008
562 Preparing the Right-of-Way 1 11/1/2008
563 Closed Circuit Television Inspection of As-Built Storm Sewer Systems 1 5/1/2014
Item No. 600's - Specification Section Revision Dated After
624 Aluminum Signs 6 5/1/2014
646 Roadside Traffic Sign Support 6 5/1/2014
649 Wide Angle Prismatic Retroreflective Sheeting for Traffic Control Signs (Diamond Grade) 4 5/1/2014
658 Delineators and Object Markers 2 3/1/2012
660 Reflectorized Pavement Markings 6 5/1/2016
661 Traffic Paint (Solvent Based) 3 3/1/2012
662 Glass Reflective Spheres for Traffic Paint 3 5/1/2014
663 Traffic Buttons and Pavement Markers 4 3/1/2012
665 Work Zone Pavement Markings 4 5/1/2016
666 Prefabricated Pavement Markings 4 11/1/2008
669 Pavement Surface Preparation for Markings 1 11/1/2008
670 Barricades 10 3/1/2012
671 Traffic Control 8 5/1/2014
672 Flagmen 7 2/1/2011
673 Constructing Detours for Maintaining Two-Way Traffic 14 9/1/2017
674 Removing Pavement Striping and Markings 3 5/1/2016
675 Traffic Paint Striping (Water Based) 2 11/1/2008
676 Traffic Paint (Water Based) 2 3/1/2012
677 Electrical Conduits for Traffic Signal Installation 3 3/1/2012
678 Zinc Coated Steel Wire Strand 2 3/1/2012
679 Insulated Jacketed Traffic Signal Cable 3 5/1/2016
680 Steel Mast Arm & Steel Strain Pole Assemblies 3 5/1/2014
681 Treated Timber Poles 3 5/1/2014
683 Traffic Signal Supports – Pedestal Poles 7 5/1/2016
686 Road Illumination Assemblies (On Traffic Signal Poles) 7 5/1/2016
687 Flasher Assembly Installation 5 3/1/2012
688 Flasher Assemblies 4 3/1/2012
689 Twelve Inch LED Traffic Signal Lamp Unit 2 5/1/2016
690 Traffic Signal Heads 6 5/1/2016
691 Twelve Inch Signal Head with Programmable Visibility of Signal Faces 2 5/1/2016
692 Pedestrian Signal Head 4 5/1/2016
694 LED Sign Lights for Traffic Signals 6 5/1/2016
696 Low Profile Concrete Barrier 2 2/1/2011
698 Temporary Polyethylene Water-Filled Barrier 1 11/1/2008
699 LED Pedestrian Traffic Signal Lamp Unit 1ST Issue 3/1/2012
Item No. 700's - Specification Section Revision Dated After
700 Notice of Intent 4 5/1/2016
713 Reinforced Filter Fabric Barrier 3 5/1/2016
719 Inlet Protection Barriers 3 5/1/2016
724 Stabilized Construction Access 5 5/1/2016
725 General Source Controls (SWPPP) 5 5/1/2016
730 Concrete Truck Washout Structures 3 5/1/2016
741 Inlet Protection Barrier (for Stage II Inlets, Gravel Bags) 6 5/1/2016
750 Rock Filter Dams 5 5/1/2016
751 SWPPP Inspection and Maintenance 2 5/1/2016
Item No. 1000's Plus - Specification Section Revision Dated After
1000 Traffic Signal Installation and Modification 2 5/1/2016
1210 Intelligent Transportation System (ITS) Controller Cabinet Assembly 1 5/1/2016
2070 Advanced Transportation Controller 1 5/1/2016

Standard Engineering Design Specifications - Effective 5/1/2016
tem No. Specification Section Revision No. Revision Date
102 Clearing and Grubbing 8 1 May 2016
104 Removing Old Concrete 5 1 June 2015
110 Roadway Excavation 9 1 May 2016
120 Excavation for Channels and Other Drainage Facilities 8 1 June 2015
130 Borrow 7 1 May 2016
132 Embankment 8 1 May 2016
160 Topsoil 7 1 May 2016
162 Sodding for Erosion Control and Stabilization 8 1 May 2016
164 Seeding and Erosion Control Blanket 5 1 June 2015
165 Hydro-Mulch Seeding (for Erosion Control and Stabilization) 6 1 June 2015
166 Fertilizer 3 1 June 2015
200 Stripping 7 1 March 2012
205 Subgrade 6 1 May 2016
220 Lime Stabilized Subgrade 1 1 May 2016
221 Hydrated Lime and Lime Slurry 5 1 May 2016
222 Portland Cement Stabilized Subgrade 4 1 May 2016
223 Lime-Fly Ash or Fly Ash Stabilized Subgrade 1st Issue 1 June 2015
224 Quicklime (Stabilization) 4 1 June 2015
230 Crushed Aggregate Base Course 5 1 May 2016
231 Cement Stabilized Crushed Aggregate Base Course 6 1 May 2016
250 Hot Mix Asphaltic Concrete Base Course (Black Base) 10 1 May 2016
251 Base Repair with Hot Mix Asphaltic Concrete Base Course 6 1 May 2016
252 In-Place Full Depth Cold Flexible Pavement Recycling 4 1 May 2014
309 Milling Existing Pavement 2 1 May 2016
310 Prime Coat/Sealer 7 1 May 2016
320 Single Course Surface Treatment 5 1 June 2015
322 Two Course Surface Treatment 6 1 June 2015
323 Emulsified Asphalt Treatment 3 1 March 2012
324 Seal Coat 4 1 May 2016
340 Hot Mix-Hot Laid Asphaltic Concrete 13 1 May 2016
341 Hot In-Place Asphalt Recycling 4 1 May 2016
360 Concrete Pavement 17 1 May 2016
361 Full Depth Repair of Concrete Pavement 5 1 May 2016
400 Structural Excavation and Backfill 5 1 May 2016
402 Bank Sand Backfill 4 1 March 2012
403 Driving Timber Piling 3 1 March 2012
404 Driving Steel Piling 3 1 March 2012
405 Driving Concrete Piling 3 1 March 2012
407 Treated and Untreated Timber Piling 3 1 March 2012
408 Steel Sheet Piling 2 1 March 2012
409 Steel H Piling 1 1 Nov. 2008
410 Prestressed Concrete Piling 3 1 March 2012
411 Drilled Shaft Foundations 4 1 March 2012
420 Concrete Structures 3 1 May 2014
421 Structural Concrete 10 1 May 2016
423 Prestressed Concrete Units 3 1 March 2012
424 Extending Concrete Structures 2 1 Nov. 2008
427 Joint Sealant for Bridges 1st Issue 1 March 2012
429 Trench Safety System 1 1 Nov. 2008
430 Construction of Underground Utilities 11 1 May 2014
431 Jacking, Boring or Tunneling Pipe 2 1 March 2012
432 Tunnel Construction 2 1 March 2012
433 Cement Stabilized Sand Bedding and Backfill Material 12 1 March 2012
434 Flowable Fill 2 1 Nov. 2008
435 Timber Ordered Left In Trench 2 1 Nov. 2008
436 Well Pointing 2 1 March 2012
437 Elastomeric Materials 3 1 May 2014
438 Preformed Joint Seal 3 1 May 2016
439 Polyurethane Joint Seal 2 1 May 2014
440 Reinforcing Steel 3 1 May 2014
441 Steel Structures 1 1 Nov. 2008
442 Metals for Structures 3 1 May 2014
445 Structural Bolting 2 1 Nov. 2008
446 Structural Welding 2 1 May 2014
447 Painting and Protective Coating 2 1 March 2012
448 Bridge Plaque 3 1 May 2014
450 Concrete and Steel Railing 4 1 March 2012
451 Removing and Replacing Damaged Railing 2 1 March 2012
452 Removing Railing 1 1 Feb. 2010
453 Temporary Railing 2 1 May 2014
455 Timber for Structures 1 1 Nov. 2008
456 Timber Structures 3 1 May 2014
457 Timber Preservatives and Treatment 2 1 May 2014
458 Hardware for Heavy Timber Construction 2 1 May 2014
459 Timber Bents 1 1 March 2012
460 Reinforced Concrete Pipe 9 1 March 2012
461 Corrugated Metal Pipe 7 1 March 2012
462 Clay Pipe 2 1 March 2012
463 Safety End Treatment 6 1 May 2014
464 PVC Pipe 1 1 Nov. 2008
465 Remove and Dispose of Existing Concrete or Metal Pipe 2 1 May 2014
471 Precast Concrete Manholes and Junction Boxes 9 1 May 2014
472 Inlets 10 1 May 2014
473 Adjusting Manholes and Inlets 2 1 Nov. 2008
476 Hydrostatic Testing of Pressure Lines 1 1 Nov. 2008
477 Low Pressure Air Test - Sanitary Sewer Line 3 1 May 2014
480 Precast Reinforced Concrete Box Sewers 1st issue 1 May 2016
481 Monolithic Reinforced Concrete Box Sewers 6 1 May 2014
491 Reinforced Concrete Slope Paving 4 1 May 2014
493 Riprap 2 1 Nov. 2008
494 Geotextiles 2 1 March 2012
495 Removing Old Structures 2 1 Nov. 2008
500 Remove and Relocate or Dispose of Traffic Signs, Mail Boxes and Roadway Signs 3 1 May 2014
501 Tree Protection and Trimming 3 1 May 2014
510 Planing and/or Texturing Pavement 2 1 May 2014
516 Installation of Flex Beam Guardrail 10 1 May 2014
520 Weighing and Measuring Equipment 2 1 May 2014
526 Membrane Curing 5 1 May 2014
530 Concrete Curb and/or Gutter, Sidewalks and Driveways 7 1 May 2016
531 Coloring Concrete for ADA Ramps 2 1 May 2014
535 Medians and Directional Islands 5 1 May 2014
536 Coloring Concrete for Median Noses 2 1 May 2014
537 Wheel Stops 2 1 May 2014
540 Removing and Disposing of Existing Asphaltic Surface and Base Material 2 1 May 2014
550 Existing Fencing and Gates 2 1 May 2014
554 Wood Fencing 2 1 May 2014
555 Chain Link Fencing 5 1 May 2014
556 Four Strand Barbed Wire Fence 4 1 May 2014
559 Construction Safety Fence 1 1 May 2014
560 Maintenance and Cleanup of the Project Site 2 1 May 2014
561 Video Recording Construction 2 1 Nov. 2008
562 Preparing the Right-of-Way 1 1 Nov. 2008
563 CCTV Inspection of As-Built Storm Sewer Systems 1 1 May 2014
624 Aluminum Signs 6 1 May 2014
646 Roadside Traffic Sign Support 6 1 May 2014
649 Wide Angle Prismatic Retroreflective Sheeting for Traffic Control Signs (Diamond Grade) 4 1 May 2014
658 Delineators and Object Markers 2 1 March 2012
660 Reflectorized Pavement Markings 6 1 May 2016
661 Traffic Paint (Solvent Based) 3 1 March 2012
662 Glass Reflective Spheres for Traffic Paint 3 1 May 2014
663 Traffic Buttons and Pavement Markers 4 1 March 2012
665 Work Zone Pavement Markings 4 1 May 2016
666 Prefabricated Pavement Markings 4 1 Nov. 2008
669 Pavement Surface Preparation for Markings 1 1 Nov. 2008
670 Barricades 10 1 March 2012
671 Traffic Control 8 1 May 2014
672 Flagmen 7 1 Feb. 2011
673 Constructing Detours for Maintaining Two-Way Traffic 13 1 May 2016
674 Removing Pavement Striping and Markings 3 1 May 2016
675 Traffic Paint Striping (Water Based) 2 1 Nov. 2008
676 Traffic Paint (Water Based) 2 1 March 2012
677 Electrical Conduits for Traffic Signal Installation 3 1 March 2012
678 Zinc Coated Steel Wire Strand 2 1 March 2012
679 Insulated Jacketed Traffic Signal Cable 3 1 May 2016
680 Steel Mast Arm & Steel Strain Pole Assemblies 3 1 May 2014
681 Treated Timber Poles 3 1 May 2014
683 Traffic Signal Supports – Pedestal Poles 7 1 May 2016
686 Road Illumination Assemblies (On Traffic Signal Poles) 7 1 May 2016
687 Flasher Assembly Installation 5 1 March 2012
688 Flasher Assemblies 4 1 March 2012
689 Twelve Inch LED Traffic Signal Lamp Unit 2 1 May 2016
690 Traffic Signal Heads 6 1 May 2016
691 Twelve Inch Signal Head with Programmable Visibility of Signal Faces 2 1 May 2016
692 Pedestrian Signal Head 4 1 May 2016
693 DELETED - Traffic Signal Lamps DELETED DELETED
694 LED Sign Lights for Traffic Signals 6 1 May 2016
696 Low Profile Concrete Barrier 2 1 Feb. 2011
698 Temporary Polyethylene Water-Filled Barrier 1 1 Nov. 2008
699 LED Pedestrian Traffic Signal Lamp Unit 1st Issue 1 March 2012
700 Notice of Intent 4 1 May 2016
713 Reinforced Filter Fabric Barrier 3 1 May 2016
719 Inlet Protection Barriers 3 1 May 2016
724 Stabilized Construction Access 5 1 May 2016
725 General Source Controls (SWPPP) 5 1 May 2016
730 Concrete Truck Washout Structures 3 1 May 2016
741 Inlet Protection Barrier (for Stage II Inlets, Gravel Bags) 6 1 May 2016
750 Rock Filter Dams 5 1 May 2016
751 SWPPP Inspection and Maintenance 2 1 May 2016
1000 Traffic Signal Installation and Modification 1 1 May 2016
1210 Intelligent Transportation System (ITS) Controller Cabinet Assembly 1 1 May 2016
2070  Advanced Transportation Controller 1 1 May 2016
Archived 2015 Specifications - Effective 5/1/2016

The June 2015 Revisions to the Standard Specifications are now available for download. Two (2) specifications have
been re-written and are considered to be first issue.  In addition, there are fourteen (14) revised specifications.

Item No. Specification Section Revision No. Revision Date
102 Clearing and Grubbing 7 1 March 2012
104 Removing Old Concrete 5 1 June 2015
110 Roadway Excavation 8 1 June 2015
120 Excavation for Channels and Other Drainage Facilities 8 1 June 2015
130 Borrow 6 1 June 2015
132 Embankment 7 1 March 2012
160 Topsoil 6 1 June 2015
162 Sodding for Erosion Control and Stabilization 7 1 March 2012
164 Seeding and Erosion Control Blanket 5 1 June 2015
165 Hydro-Mulch Seeding (for Erosion Control and Stabilization) 6 1 June 2015
166 Fertilizer 3 1 June 2015
200 Stripping 7 1 March 2012
205 Subgrade 5 1 June 2015
220 Lime Stabilized Subgrade 1st Issue 1 June 2015
221 Hydrated Lime and Lime Slurry 4 1 June 2015
222 Portland Cement Stabilized Subgrade 3 1 March 2012
223 Lime-Fly Ash or Fly Ash Stabilized Subgrade 1st Issue 1 June 2015
224 Quicklime (Stabilization) 4 1 June 2015
230 Crushed Aggregate Base Course 4 1 March 2012
231 Cement Stabilized Crushed Aggregate Base Course 5 1 May 2014
250 Hot Mix Asphaltic Concrete Base Course (Black Base) 9 1 May 2014
251 Base Repair with Hot Mix Asphaltic Concrete Base Course 5 1 March 2012
252 In-Place Full Depth Cold Flexible Pavement Recycling 4 1 May 2014
309 Milling Existing Pavement 1 1 Nov. 2008
310 Prime Coat/Sealer 6 1 June 2015
320 Single Course Surface Treatment 5 1 June 2015
322 Two Course Surface Treatment 6 1 June 2015
323 Emulsified Asphalt Treatment 3 1 March 2012
324 Seal Coat 3 1 March 2012
340 Hot Mix-Hot Laid Asphaltic Concrete 12 1 May 2014
341 Hot In-Place Asphalt Recycling 3 1 March 2012
360 Concrete Pavement 16 1 May 2014
361 Full Depth Repair of Concrete Pavement 4 1 May 2014
400 Structural Excavation and Backfill 4 1 March 2012
402 Bank Sand Backfill 4 1 March 2012
403 Driving Timber Piling 3 1 March 2012
404 Driving Steel Piling 3 1 March 2012
405 Driving Concrete Piling 3 1 March 2012
407 Treated and Untreated Timber Piling 3 1 March 2012
408 Steel Sheet Piling 2 1 March 2012
409 Steel H Piling 1 1 Nov. 2008
410 Pre-stressed Concrete Piling 3 1 March 2012
411 Drilled Shaft Foundations 4 1 March 2012
420 Concrete Structures 3 1 May 2014
421 Structural Concrete 9 1 May 2014
423 Pre-stressed Concrete Units 3 1 March 2012
424 Extending Concrete Structures 2 1 Nov. 2008
427 Joint Sealant for Bridges 1st Issue 1 March 2012
429 Trench Safety System 1 1 Nov. 2008
430 Construction of Underground Utilities 11 1 May 2014
431 Jacking, Boring or Tunneling Pipe 2 1 March 2012
432 Tunnel Construction 2 1 March 2012
433 Cement Stabilized Sand Bedding and Backfill Material 12 1 March 2012
434 Flowable Fill 2 1 Nov. 2008
435 Timber Ordered Left In Trench 2 1 Nov. 2008
436 Well Pointing 2 1 March 2012
437 Elastomeric Materials 3 1 May 2014
438 Preformed Joint Seal 2 1 March 2012
439 Polyurethane Joint Seal 2 1 May 2014
440 Reinforcing Steel 3 1 May 2014
441 Steel Structures 1 1 Nov. 2008
442 Metals for Structures 3 1 May 2014
445 Structural Bolting 2 1 Nov. 2008
446 Structural Welding 2 1 May 2014
447 Painting and Protective Coating 2 1 March 2012
448 Bridge Plaque 3 1 May 2014
450 Concrete and Steel Railing 4 1 March 2012
451 Removing and Replacing Damaged Railing 2 1 March 2012
452 Removing Railing 1 1 Feb. 2010
453 Temporary Railing 2 1 May 2014
455 Timber for Structures 1 1 Nov. 2008
456 Timber Structures 3 1 May 2014
457 Timber Preservatives and Treatment 2 1 May 2014
458 Hardware for Heavy Timber Construction 2 1 May 2014
459 Timber Bents 1 1 March 2012
460 Reinforced Concrete Pipe 9 1 March 2012
461 Corrugated Metal Pipe 7 1 March 2012
462 Clay Pipe 2 1 March 2012
463 Safety End Treatment 6 1 May 2014
464 PVC Pipe 1 1 Nov. 2008
465 Remove and Dispose of Existing Concrete or Metal Pipe 2 1 May 2014
471 Precast Concrete Manholes and Junction Boxes 9 1 May 2014
472 Inlets 10 1 May 2014
473 Adjusting Manholes and Inlets 2 1 Nov. 2008
476 Hydrostatic Testing of Pressure Lines 1 1 Nov. 2008
477 Low Pressure Air Test - Sanitary Sewer Line 3 1 May 2014
480 Precast Reinforced Concrete Box Sewers 14 1 May 2014
481 Monolithic Reinforced Concrete Box Sewers 6 1 May 2014
491 Reinforced Concrete Slope Paving 4 1 May 2014
493 Riprap 2 1 Nov. 2008
494 Geotextiles 2 1 March 2012
495 Removing Old Structures 2 1 Nov. 2008
500 Remove and Relocate or Dispose of Traffic Signs, Mail Boxes and Roadway Signs 3 1 May 2014
501 Tree Protection and Trimming 3 1 May 2014
510 Planning and/or Texturing Pavement 2 1 May 2014
515 DELETED Roadway Shell DELETED DELETED
516 Installation of Flex Beam Guardrail 10 1 May 2014
520 Weighing and Measuring Equipment 2 1 May 2014
526 Membrane Curing 5 1 May 2014
530 Concrete Curb and/or Gutter, Sidewalks and Driveways 6 1 May 2014
531 Coloring Concrete for ADA Ramps 2 1 May 2014
535 Medians and Directional Islands 5 1 May 2014
536 Coloring Concrete for Median Noses 2 1 May 2014
537 Wheel Stops 2 1 May 2014
540 Removing and Disposing of Existing Asphaltic Surface and Base Material 2 1 May 2014
550 Existing Fencing and Gates 2 1 May 2014
551 DELETED Clearing, Grubbing and Fencing DELETED DELETED
554 Wood Fencing 2 1 May 2014
555 Chain Link Fencing 5 1 May 2014
556 Four Strand Barbed Wire Fence 4 1 May 2014
559 Construction Safety Fence 1 1 May 2014
560 Maintenance and Cleanup of the Project Site 2 1 May 2014
561 Video Recording Construction 2 1 Nov. 2008
562 Preparing the Right-of-Way 1 1 Nov. 2008
563 CCTV Inspection of As-Built Storm Sewer Systems 1 1 May 2014
624 Aluminum Signs 6 1 May 2014
646 Roadside Traffic Sign Support 6 1 May 2014
648 DELETED Encapsulated Lens Reflective Sheeting for Traffic Control Signs (Hi-Intensity Grade) DELETED DELETED
649 Wide Angle Prismatic Retro reflective Sheeting for Traffic Control Signs (Diamond Grade) 4 1 May 2014
658 Delineators and Object Markers 2 1 March 2012
660 Reflectorized Pavement Markings 5 1 March 2012
661 Traffic Paint (Solvent Based) 3 1 March 2012
662 Glass Reflective Spheres for Traffic Paint 3 1 May 2014
663 Traffic Buttons and Pavement Markers 4 1 March 2012
665 Work Zone Pavement Markings 3 1 Nov. 2008
666 Prefabricated Pavement Markings 4 1 Nov. 2008
669 Pavement Surface Preparation for Markings 1 1 Nov. 2008
670 Barricades 10 1 March 2012
671 Traffic Control 8 1 May 2014
672 Flagmen 7 1 Feb. 2011
673 Constructing Detours for Maintaining Two-Way Traffic 12 1 May 2014
674 Removing Pavement Striping and Markings 2 1 Nov. 2008
675 Traffic Paint Striping (Water Based) 2 1 Nov. 2008
676 Traffic Paint (Water Based) 2 1 March 2012
677 Electrical Conduits for Traffic Signal Installation 3 1 March 2012
678 Zinc Coated Steel Wire Strand 2 1 March 2012
679 Insulated Jacketed Traffic Signal Cable 2 1 March 2012
680 Steel Mast Arm & Steel Strain Pole Assemblies 3 1 May 2014
681 Treated Timber Poles 3 1 May 2014
683 Traffic Signal Supports – Pedestal Poles 6 1 May 2014
686 Road Illumination Assemblies (On Traffic Signal Poles) 6 1 March 2012
687 Flasher Assembly Installation 5 1 March 2012
688 Flasher Assemblies 4 1 March 2012
689 Twelve Inch LED Traffic Signal Lamp Unit 1 1 May 2014
690 Traffic Signal Heads 5 1 March 2012
691 Twelve Inch Signal Head with Programmable Visibility of Signal Faces 1 1 Nov. 2008
692 Symbolic Pedestrian Signal Head (Incandescent Type) 3 1 March 2012
693 Traffic Signal Lamps 3 1 May 2014
694 Sign Lights for Traffic Signals 5 1 March 2012
696 Low Profile Concrete Barrier 2 1 Feb. 2011
698 Temporary Polyethylene Water-Filled Barrier 1 1 Nov. 2008
699 LED Pedestrian Traffic Signal Lamp Unit 1st Issue 1 March 2012
700 Notice of Intent 3 1 May 2014
713 Reinforced Filter Fabric Barrier 2 1 March 2012
719 Inlet Protection Barriers 2 1 March 2012
724 Stabilized Construction Access 4 1 May 2014
725 General Source Controls (SWPPP) 4 1 May 2014
730 Concrete Truck Washout Structures 2 1 May 2014
741 Inlet Protection Barrier (for Stage II Inlets, Gravel Bags) 5 1 May 2014
750 Rock Filter Dams 4 1 May 2014
751 SWPPP Inspection and Maintenance 1 1 March 2012
1000 Traffic Signal Installation and Modification 1 1 March 2012
1210 Intelligent Transportation System (ITS) Controller Cabinet Assembly 1st Issue 1 Feb. 2011
2070 Advanced Transportation Controller 1st Issue 1 Feb. 2011
Archived 2014 Specifications

The May 2014 Revisions to the Standard Specifications are now available for download. There are sixty-five (65) revised specifications, and three (3) deleted specifications

 

Item No. Specification Section Revision No. Revision Date
102 Clearing and Grubbing 7 1 March 2012
104 Removing Old Concrete 4 1 May 2014
110 Roadway Excavation 7 1 March 2012
120 Excavation for Channels and Other Drainage Facilities 7 1 May 2014
130 Borrow 5 1 Nov. 2008
132 Embankment 7 1 March 2012
160 Topsoil 5 1 March 2012
162 Sodding for Erosion Control and Stabilization 7 1 March 2012
164 Seeding and Erosion Control Blanket 4 1 Nov. 2008
165 Hydro-Mulch Seeding (for Erosion Control and Stabilization) 5 1 Nov. 2008
166 Fertilizer 2 1 Nov. 2008
200 Stripping 7 1 March 2012
205 Subgrade 4 1 March 2012
220 Lime Stabilized Subgrade 5 1 March 2012
221 Hydrated Lime and Lime Slurry 3 1 March 2012
222 Portland Cement Stabilized Subgrade 3 1 March 2012
223 Lime-Fly Ash or Fly Ash Stabilized Subgrade 5 1 March 2012
224 Quicklime (Stabilization) 3 1 March 2012
230 Crushed Aggregate Base Course 4 1 March 2012
231 Cement Stabilized Crushed Aggregate Base Course 5 1 May 2014
250 Hot Mix Asphaltic Concrete Base Course (Black Base) 9 1 May 2014
251 Base Repair with Hot Mix Asphaltic Concrete Base Course 5 1 March 2012
252 In-Place Full Depth Cold Flexible Pavement Recycling 4 1 May 2014
309 Milling Existing Pavement 1 1 Nov. 2008
310 Prime Coat/Sealer 5 1 March 2012
320 Single Course Surface Treatment 4 1 March 2012
322 Two Course Surface Treatment 5 1 March 2012
323 Emulsified Asphalt Treatment 3 1 March 2012
324 Seal Coat 3 1 March 2012
340 Hot Mix-Hot Laid Asphaltic Concrete 12 1 May 2014
341 Hot In-Place Asphalt Recycling 3 1 March 2012
360 Concrete Pavement 16 1 May 2014
361 Full Depth Repair of Concrete Pavement 4 1 May 2014
400 Structural Excavation and Backfill 4 1 March 2012
402 Bank Sand Backfill 4 1 March 2012
403 Driving Timber Piling 3 1 March 2012
404 Driving Steel Piling 3 1 March 2012
405 Driving Concrete Piling 3 1 March 2012
407 Treated and Untreated Timber Piling 3 1 March 2012
408 Steel Sheet Piling 2 1 March 2012
409 Steel H Piling 1 1 Nov. 2008
410 Prestressed Concrete Piling 3 1 March 2012
411 Drilled Shaft Foundations 4 1 March 2012
420 Concrete Structures 3 1 May 2014
421 Structural Concrete 9 1 May 2014
423 Prestressed Concrete Units 3 1 March 2012
424 Extending Concrete Structures 2 1 Nov. 2008
427 Joint Sealant for Bridges 1st Issue 1 March 2012
429 Trench Safety System 1 1 Nov. 2008
430 Construction of Underground Utilities 11 1 May 2014
431 Jacking, Boring or Tunneling Pipe 2 1 March 2012
432 Tunnel Construction 2 1 March 2012
433 Cement Stabilized Sand Bedding and Backfill Material 12 1 March 2012
434 Flowable Fill 2 1 Nov. 2008
435 Timber Ordered Left In Trench 2 1 Nov. 2008
436 Well Pointing 2 1 March 2012
437 Elastomeric Materials 3 1 May 2014
438 Preformed Joint Seal 2 1 March 2012
439 Polyurethane Joint Seal 2 1 May 2014
440 Reinforcing Steel 3 1 May 2014
441 Steel Structures 1 1 Nov. 2008
442 Metals for Structures 3 1 May 2014
445 Structural Bolting 2 1 Nov. 2008
446 Structural Welding 2 1 May 2014
447 Painting and Protective Coating 2 1 March 2012
448 Bridge Plaque 3 1 May 2014
450 Concrete and Steel Railing 4 1 March 2012
451 Removing and Replacing Damaged Railing 2 1 March 2012
452 Removing Railing 1 1 February 2010
453 Temporary Railing 2 1 May 2014
455 Timber for Structures 1 1 Nov. 2008
456 Timber Structures 3 1 May 2014
457 Timber Preservatives and Treatment 2 1 May 2014
458 Hardware for Heavy Timber Construction 2 1 May 2014
459 Timber Bents 1 1 March 2012
460 Reinforced Concrete Pipe 9 1 March 2012
461 Corrugated Metal Pipe 7 1 March 2012
462 Clay Pipe 2 1 March 2012
463 Safety End Treatment 6 1 May 2014
464 PVC Pipe 1 1 Nov. 2008
465 Remove and Dispose of Existing Concrete or Metal Pipe 2 1 May 2014
471 Precast Concrete Manholes and Junction Boxes 9 1 May 2014
472 Inlets 10 1 May 2014
473 Adjusting Manholes and Inlets 2 1 Nov. 2008
476 Hydrostatic Testing of Pressure Lines 1 1 Nov. 2008
477 Low Pressure Air Test - Sanitary Sewer Line 3 1 May 2014
480 Precast Reinforced Concrete Box Sewers 14 1 May 2014
481 Monolithic Reinforced Concrete Box Sewers 6 1 May 2014
491 Reinforced Concrete Slope Paving 4 1 May 2014
493 Riprap 2 1 Nov. 2008
494 Geotextiles 2 1 March 2012
495 Removing Old Structures 2 1 Nov. 2008
500 Remove and Relocate or Dispose of Traffic Signs, Mail Boxes and Roadway Signs 3 1 May 2014
501 Tree Protection and Trimming 3 1 May 2014
510 Planing and/or Texturing Pavement 2 1 May 2014
515 DELETED Roadway Shell DELETED DELETED
516 Installation of Flex Beam Guardrail 10 1 May 2014
520 Weighing and Measuring Equipment 2 1 May 2014
526 Membrane Curing 5 1 May 2014
530 Concrete Curb and/or Gutter, Sidewalks and Driveways 6 1 May 2014
531 Coloring Concrete for ADA Ramps 2 1 May 2014
535 Medians and Directional Islands 5 1 May 2014
536 Coloring Concrete for Median Noses 2 1 May 2014
537 Wheel Stops 2 1 May 2014
540 Removing and Disposing of Existing Asphaltic Surface and Base Material 2 1 May 2014
550 Existing Fencing and Gates 2 1 May 2014
551 DELETED Clearing, Grubbing and Fencing DELETED DELETED
554 Wood Fencing 2 1 May 2014
555 Chain Link Fencing 5 1 May 2014
556 Four Strand Barbed Wire Fence 4 1 May 2014
559 Construction Safety Fence 1 1 May 2014
560 Maintenance and Cleanup of the Project Site 2 1 May 2014
561 Video Recording Construction 2 1 Nov. 2008
562 Preparing the Right-of-Way 1 1 Nov. 2008
563 CCTV Inspection of As-Built Storm Sewer Systems 1 1 May 2014
624 Aluminum Signs 6 1 May 2014
646 Roadside Traffic Sign Support 6 1 May 2014
648 DELETED Encapsulated Lens Reflective Sheeting for Traffic Control Signs (Hi-Intensity Grade) DELETED DELETED
649 Wide Angle Prismatic Retroreflective Sheeting for Traffic Control Signs (Diamond Grade) 4 1 May 2014
658 Delineators and Object Markers 2 1 March 2012
660 Reflectorized Pavement Markings 5 1 March 2012
661 Traffic Paint (Solvent Based) 3 1 March 2012
662 Glass Reflective Spheres for Traffic Paint 3 1 May 2014
663 Traffic Buttons and Pavement Markers 4 1 March 2012
665 Work Zone Pavement Markings 3 1 Nov. 2008
666 Prefabricated Pavement Markings 4 1 Nov. 2008
669 Pavement Surface Preparation for Markings 1 1 Nov. 2008
670 Barricades 10 1 March 2012
671 Traffic Control 8 1 May 2014
672 Flagmen 7 1 February 2011
673 Constructing Detours for Maintaining Two-Way Traffic 12 1 May 2014
674 Removing Pavement Striping and Markings 2 1 Nov. 2008
675 Traffic Paint Striping (Water Based) 2 1 Nov. 2008
676 Traffic Paint (Water Based) 2 1 March 2012
677 Electrical Conduits for Traffic Signal Installation 3 1 March 2012
678 Zinc Coated Steel Wire Strand 2 1 March 2012
679 Insulated Jacketed Traffic Signal Cable 2 1 March 2012
680 Steel Mast Arm & Steel Strain Pole Assemblies 3 1 May 2014
681 Treated Timber Poles 3 1 May 2014
683 Traffic Signal Supports – Pedestal Poles 6 1 May 2014
686 Road Illumination Assemblies (On Traffic Signal Poles) 6 1 March 2012
687 Flasher Assembly Installation 5 1 March 2012
688 Flasher Assemblies 4 1 March 2012
689 Twelve Inch LED Traffic Signal Lamp Unit 1 1 May 2014
690 Traffic Signal Heads 5 1 March 2012
691 Twelve Inch Signal Head with Programmable Visibility of Signal Faces 1 1 Nov. 2008
692 Symbolic Pedestrian Signal Head (Incandescent Type) 3 1 March 2012
693 Traffic Signal Lamps 3 1 May 2014
694 Sign Lights for Traffic Signals 5 1 March 2012
696 Low Profile Concrete Barrier 2 1 February 2011
698 Temporary Polyethylene Water-Filled Barrier 1 1 Nov. 2008
699 LED Pedestrian Traffic Signal Lamp Unit 1st Issue 1 March 2012
700 Notice of Intent 3 1 May 2014
713 Reinforced Filter Fabric Barrier 2 1 March 2012
719 Inlet Protection Barriers 2 1 March 2012
724 Stabilized Construction Access 4 1 May 2014
725 General Source Controls (SWPPP) 4 1 May 2014
730 Concrete Truck Washout Structures 2 1 May 2014
741 Inlet Protection Barrier (for Stage II Inlets, Gravel Bags) 5 1 May 2014
750 Rock Filter Dams 4 1 May 2014
751 SWPPP Inspection and Maintenance 1 1 March 2012
1000 Traffic Signal Installation and Modification 1 1 March 2012
1210 Intelligent Transportation System (ITS) Controller Cabinet Assembly 1st Issue 1 February 2011
2070 Advanced Transportation Controller 1st Issue 1 February 2011