West Gulf Bank Road from Interstate Highway (IH) 45 to East of Airline Drive

WGB


The proposed improvements consist of reconstructing West Gulf Bank Road from a two‑lane undivided roadway to a four-lane divided boulevard with modernized traffic signals at Sweetwater Lane and Airline Drive and a new signalized intersection at Cobbleshire Drive. A closed drainage system with underground storm sewers will replace the existing side ditches. Proposed improvements also include the construction of 8-foot pedestrian/bicycle paths and ramps along each side of the corridor to limit conflict points between vehicles, pedestrians, and bicyclists.

Virtual Public Meeting

A virtual public meeting for the proposed project is scheduled to gather feedback and answer questions from the community.

Date: Tuesday, September 1, 2020
Time: 6:30 p.m. - 7:30 p.m.

To attend the virtual public meeting, please use the call-in and online access information below.

Online Access: Click HERE or the link below

https://hollowayecs.webex.com/hollowayecs/onstage/
g.php?MTID=e516b9c247525f40f664efe5f1d8cb2f5

Call-In: 1-408-418-9388
Meeting Access Code: 132 043 0714#